This diagram shows the before and after of the implementation of the resort on the terrain. The intervention aims to avoid changing the existing orography and to adapt the architecture to the waves of the ground.
To achieve optimum accessibility to the villas, these are located on the slopes of the hills, forming five clusters connected by the main circulation system.
In this way, most of the residences occupy the site of the former rice fields, a first artificial modification of the terrain that terraced the western part of the site.